Beach Entry Pools Costa Mesa, CA — Shoreline Pools for Eastside, Westside & Mesa Verde
Picture a soft golden shoreline that starts at your patio and slopes gently into clear, warm water. A beach entry pool puts that shoreline in a Costa Mesa backyard — no beach parking, no towels full of sand, no cold Pacific.
the Water
COSTA MESA BEACH ENTRY POOLS
What Is a Beach Entry Sand Pool?
A beach entry pool — also called a zero entry or walk-in pool — has no steps and no ladder. The floor rises gradually from swimming depth right up to dry deck, the way the shoreline meets the water at the beach. A sand pool takes the idea further: the entire beach and floor are finished in Italian quartz sand and marble aggregates bonded with a two-component resin. It feels like sand underfoot, but it is locked in place, so nothing washes into the filter and the surface never needs replacing. For Costa Mesa families who love the coast but not the drive down Newport Boulevard on a July Saturday, it is a beach in your backyard.
Werth Builders has built pools across Costa Mesa since 1994 and now builds beach entry shoreline pools, built with the patented Italian sand-pool system. That pairs a new kind of pool with a contractor who already knows how Eastside side-yard access works, what a 1950s Westside or College Park lot hides underground, and how City of Costa Mesa Building Safety permits move. Once permits are issued, on-site construction runs roughly 10-20 days — no steel rebar cage, no gunite shell, no weeks of curing.
- Walk-in shoreline — no steps, no ladder
- Real Italian quartz sand & marble, bonded so it never moves
- Patented floor circulation — less algae, less cleaning
- Any shape or depth: deep end, spa, swim-up bar, waterfalls
- All City of Costa Mesa permits handled in-house
WHAT IS A SAND POOL?
Like Walking Into the Ocean — In Your Own Backyard
If you have never seen one, here is the short version. A beach entry pool replaces plaster, tile, and steps with a hand-sculpted shoreline of real Italian quartz sand and marble. You walk in from the deck the way you walk into the sea.
Walk Right In
No ladder, no steep steps. The floor slopes gently from dry deck to swimming depth. Toddlers splash in a few inches of water, grandparents stroll in, and everyone else lounges in the shallows.
Feels Like Sand. Stays Put.
Natural quartz sand and marble, bonded with a two-part resin into a solid surface. Soft, warm texture underfoot — but nothing washes into the filter or tracks into the house, and it never needs replacing.
Water Rises Through the Floor
A patented sand-pool system pushes filtered water up evenly through the entire surface — no dead corners for algae, no wall jets or main drains to look at, and far less brushing and vacuuming.
Also called: beach entry pool · shoreline pool · zero entry pool · walk-in pool · sand pool · lagoon pool · resort-style pool
Want the detail? The full guide shows how the four layers go together, how long the build takes, and how a sand pool compares with gunite, fiberglass and vinyl.
CHOOSE YOUR SHORELINE
10 Natural Sand & Marble Finishes
From white sand flecked with Caribbean blue to golden beach sand, salt-and-pepper, and smooth marble pebble. The color of the sand sets the color of the water — lighter sand reads bright turquoise, darker sand reads deep lagoon blue. We bring real samples to your consultation.
SAND POOL GALLERY
See What’s Possible
Beach entry and shoreline pools built with the same sand-pool system we install. Every one is sculpted by hand, so no two look alike.














Gallery photos: sand pool projects and design renderings.
WHY IT FITS COSTA MESA
A Beach Entry Pool Made for Costa Mesa
Every beach entry pool is sculpted by hand on site — so we design around your lot, your neighborhood, and how your family actually spends a summer afternoon.
Built for Eastside Side-Yard Access
Eastside Costa Mesa lots usually have room for a pool but very little room to get equipment past the house. A beach entry build skips the rebar cage and the shotcrete pump truck of a traditional shell, which keeps the on-site footprint lighter and the build roughly 10-20 days once permits are issued. We plan staging and access the same way we have on Eastside lots for decades.
A Fresh Answer for Mid-Century Yards
College Park, Mesa del Mar, Halecrest, and original Mesa Verde are full of 6,500-8,500 square foot lots that never had a pool, or lost theirs decades ago. A beach entry pool can be laid out in almost any shape, so it can wrap around a mature tree line, follow a ranch-house patio, or tuck a compact shallow beach and spa into a corner of the yard.
Mesa Verde Resort Backyards
On larger Mesa Verde lots near the country club, a beach entry can become the centerpiece of a full resort-style yard: a lounging beach for chairs in the water, a deeper swimming area, an integrated or spillover spa, and a swim-up bar. Finish colors like Caraibi (white with Caribbean-blue flecks) or Capri read bright and clean against the green fairway backdrop.
Fewer Chores, Even Water Temperature
The patented sand-pool circulation pipes filtered water beneath a permeable layer and lets it rise evenly through the whole floor and beach. There are no visible wall jets or main drains, no dead zones for algae to settle in, and far less brushing and vacuuming. The water stays an even temperature from the deep end right up to the shallow beach.
BEACH ENTRY POOL FAQs
Beach Entry Pool Questions in Costa Mesa
A typical beach entry pool runs $80,000 to $300,000+, depending on size, features, and the site. A compact beach-and-spa layout on an Eastside or Westside lot sits toward the lower end; a Mesa Verde resort yard with a lounging beach, spa, swim-up bar, and waterfall sits toward the upper end. We provide free in-home consultations with a line-item quote.
Yes. A beach entry pool is a swimming pool under the code, so it needs a City of Costa Mesa Building Safety permit like any other pool, and it must meet the California pool safety requirements, including at least 2 of 7 approved drowning-prevention features. Most Costa Mesa neighborhoods are non-HOA; if your home is in a Mesa Verde sub-tract or South Coast Metro community with design review, we prepare that submittal too.
On-site construction is roughly 10-20 days once permits are issued. There is no steel rebar cage, no gunite shell, and no weeks of curing like a traditional pool. Design and City of Costa Mesa permitting time is separate, and tight-access Eastside lots can need extra staging planning.
Most Costa Mesa lots run 5,500 to 8,500 square feet, and that is plenty of room. Because a beach entry pool can be any shape, size, or depth, we can design a short beach that drops to a swimming area with vertical walls, add a lap lane, or build a compact beach entry plunge with an integrated spa. We will walk the yard and show you what fits.
No — usually easier than a traditional pool. The sand is bonded with resin, so it does not wash into the filter, and the floor circulation means far less brushing and vacuuming. It runs on normal pool equipment and works with chlorine, saltwater, UV, or ozone. The resin finish is re-sprayed about every 2 years, and the system carries a 10-year warranty.
Yes. Werth Builders is a fully licensed California pool contractor (CSLB #777-575, B-1 General + C-53 Swimming Pool), bonded, and insured for general liability and workers' compensation. We have been building and remodeling in Southern California since 1994. Always verify any contractor's license at cslb.ca.gov before signing.
We work with several specialty pool-and-backyard finance partners that offer competitive fixed-rate loans and HELOC alternatives. We can introduce you, but we never sell financing as part of our quote — there is no markup or kickback on financed projects.
How it works, cost, care and safety: see all 36 beach entry pool questions →
MORE WERTH BUILDERS SERVICES
Other Services in Costa Mesa
Beach Entry Pools in Other Cities
OUR QUOTE PROCESS
Ready to Build Your Dream Pool? Let's Start!
Serving Huntington Beach, Long Beach, Newport Beach & Orange County
Schedule
Fill out the simple form or call to schedule your no obligation consultation.
Design
We'll create a full 3-D video design with 30 still images of your dream pool.
Quote
Receive transparent, no-surprise pricing with permit acquisition included.
⚡ 5–6 Week Build Times — from first dig to water.
*Build time is measured from excavation to water. Total project length depends on permit approval times, which vary by city.
WHAT OUR CLIENTS SAY
Real Stories, Real Results
See why Orange County homeowners trust Werth Builders
A Shoreline Thirty Steps From the Kitchen
Eastside, Westside, Mesa Verde, College Park — tell us about your Costa Mesa yard and we will show you how a beach entry sand pool fits it, from layout and finish color to permits and the 10-20 day build.